Cogmind Development Progress Chart

WHAT IS COGMIND?

A science fiction-themed traditional roguelike in which you play a robot that builds itself from components found or salvaged from other robots.

HOW DOES IT PLAY?

While exploring the world you find (or take) power sources, propulsion units, utilities, and weapons, and attach them to yourself to create a slow tank bristling with weapons, or a fast-moving flier zipping past enemies before they even have time to react, or a stealthy sword-wielding assassin/hacker, or whatever else you can come up with from the salvage you find. The situation can quickly change as you lose components and rebuild yourself from enemy remains.

Action is turn-based but you don't have "action points" per se; instead, every action takes a certain amount of time, and robots that can perform actions more quickly can continue to do so until another robot is ready to act.

Combat is optional if you can avoid it, and there is no grinding for XP since the game rewards you for simply reaching new areas.

While not fighting/sneaking, you can find or construct allies, hack machines, manipulate your enemies, and explore the story through terminals spread throughout the complex, as well as via NPC interactions found mostly in branching areas.

To learn more about the mechanics, the latest manual is available online here (it's also in the game itself, with its own UI). But you don't need to understand or even read the manual to get into the game, as there is a quick built-in tutorial that covers the important stuff.

HOW ARE THE CONTROLS?

Every command is accessible via both mouse and keyboard, so you can play with either, or a hybrid of the two. The UI is designed to provide the most intuitive and quickest possible access to a huge array of possibilities. Cogmind is even the first ASCII game to support drag and drop interaction.

LOOKS COMPLICATED...

Cogmind is designed to have "dynamic depth." At the simplest level you can jump in and spend 15 minutes shooting up robots without worrying about all the details--just attach the highest-rated parts you find. Those who want a deeper experience can examine the stats and abilities, put together a build with a special focus, hack terminals for intel and other benefits, explore alternate areas of the world with different consequences for the story... All of it is pretty optional depending on how you want to play, and in either case it's very easy to pick up and play (a short tutorial will cover the basics).

WHAT IS A ROGUELIKE?

Everyone has their own definition, but "traditional" roguelikes can be summed up as turn-based tactical/strategy games that take place in a procedurally generated world and feature permadeath. It's a highly mechanics-focused genre that rewards dynamic problem solving skills and therefore the best roguelikes tend to offer deeper gameplay and greater replayability than many of today's mainstream games. The best way to understand roguelikes is to play more of them and come up with your own definition with which you can join in the endless arguments on the Internet! (You can also read an in-depth introduction to Cogmind's traditional and not-so-traditional roguelike features here, and check out a visual summary of how Cogmind is pushing the genre forward in new ways here.)

ASCII OR TILES?

As you'll see in both the trailer and the screenshots, Cogmind is capable of displaying both a tileset (the default mode) and full ASCII. The latter is the mode the game was initially developed for (highly recommended!), though Kacper Woźniak has done an amazing job pixeling the world of Cogmind.

In terms of text, Cogmind comes with dozens of alternative fonts manually scaled for a pixel-perfect appearance at all resolutions.

WHAT PLATFORMS ARE SUPPORTED?

Windows only. The engine is old, large and not built for cross-platform use, making native ports extremely time-consuming and unlikely. Cogmind does, however, work flawlessy under Wine and similar solutions, which many Linux/OSX players have used to run Cogmind. (There are reports Cogmind runs more smoothly in this manner than many games ported natively!)

As of August 2018, Linux players can also buy, install, and play the Windows version directly via Steam, as it runs normally under Proton.

On macOS it is sometimes more complicated to run Cogmind, at least after 10.14 Mojave since Apple dropped support for 32-bit applications, though there is always still some manner to run it that works fine, such as Crossover.

Followers also often ask about mobile/tablet support. Games for those platforms are best designed from the bottom up to work in that environment, while Cogmind focuses on what works best for PCs. Many design elements, everything from the interface to the mechanics, would be quite different if implementing the same underlying concept for that kind of platform.

WHY IS BETA ACCESS SO EXPENSIVE?

Cogmind's budget is deceptively huge. It's the product of over ten years of full-time work and includes far more sound effect assets than any other roguelike (sfx are expensive, by the way). Despite its high production value, though, the audience for Cogmind is relatively small. High-quality niche games need to cost more or they simply aren't financially feasible to create (see Atlus Tax). Steady support from a small but devoted player base at the current price has enabled development to continue far beyond its original scope, so many thanks to everyone making this possible! For an idea of what goes into developing Cogmind, see the annual reviews. I've also written a lot more on the topic of pricing roguelikes, based on my experiences so far. Having been able to sustainably continue expanding the world for so many years has allowed Cogmind to blossom into a deep experience shaped around hundreds of hours of unique content.

WILL COGMIND BE ON STEAM/GOG?

After over four years of development, including two-years of pre-Steam alpha access, Cogmind joined Steam EA October 16th, 2017.

GOG at one point years ago contacted me to say they would like to see Cogmind on their platform, though when later asked for business-related details they did not respond, so I don't know what to think about that. Anyway, GOG does have a relevant wishlist here :)

HOW LONG HAS COGMIND BEEN IN DEVELOPMENT?

Concept design began in February 2012 in preparation for the 7DRL challenge that year. The 7DRL version was coded and released in March 2012, then updated several times over the following two months during which it was well received in the roguelike community. That popularity was part of what convinced me to pick it up again a year later in June 2013, taking the 7DRL version as a successful prototype for a deeper game. Cogmind has been in full-time development since then. You can read about the process on the devblog, where each year I also do an annual review summarizing what went into that year of development.

The original 7DRL/prototype is still playable as a free download available here. The current game is significantly more advanced, but the prototype does at least reflect the core mechanic, and serves as a demonstration of what the game evolved from.

WHEN IS 1.0?

Cogmind's story and mechanics are complete as of May 2017, though there are still more optional features to work on before setting a specific deadline for 1.0 itself. There are very clear design goals (see the roadmap to the right of this FAQ for the gist of it), but at the same time the response to the May 2015 alpha launch was so overwhelming that the long-term release schedule has been repeatedly extended to take advantage of that support and make the game even better by adding extra features and polish rather than rushing to call it done. So while it will take longer to reach 1.0 than initally planned, the final game will undoubtedly be even better for it!

Note that general progress updates do not appear on the devblog, but are instead announced on the forums and other social media locations found on the contact page.

HOW CAN I HELP?

There are lots of ways to help Cogmind become an even better game, either directly or indirectly:
  • Play and provide feedback
  • Leave a Steam review (there are occasional incentives if you need one, basically it just means more development and content, like this first one I set up and later delivered)
  • Spread the word among your friends and any relevant communities you may be a part of
  • Share stories about cool or fun stuff you've found or done in the world of Cogmind on the forums, Steam, or elsewhere
  • Add good content to the wiki, Wikipedia, or TV Tropes
  • Stream gameplay or record videos to share
  • Gift copies to others on Steam who would enjoy it
  • Become a patron of my work
  • Make a donation
Any help you can provide is greatly appreciated!

WHERE CAN I GET MORE INFO?

See the contact page for links to many other locations where you can learn about Cogmind, as well as interact with current players.